2008.10.05

Deck

Category: Home Improvement


The back deck isnt quite finished, but it is close. Check out the transformation:

Footings poured

Because the septic tank is close to the house, we had to frame around the openings so we could cut out some access covers

Here is the lower portion with the decking in process

Decking all finished on the lower portion

The upper portion is all framed in

The decking going down on the upper portion

We have to finish the decking on the upper portion, and then tackle the steps and railings, but at least it is semi-functional at this point.


 

@briandunnington


2022.11.15

Windstorm, fallen tree, happy ending

We had a big windstorm blow a tree down but made the best of it

Read more »


2022.09.20

Ranger Tug R23 Solar Upgrade

Upgrading our solar setup for energy independence

Read more »


2022.09.15

Ranger Tug R23 End of Summer mods & San Juan trip

A few small upgrades for the boat and an end-of-summer trip to the San Juan islands

Read more »


2022.08.03

Ranger Tug R23 SmartPlug & Galvanic Isolator

Replacing the shore power plug with a SmartPlug and adding a galvanic isolator

Read more »


2022.05.24

Ranger Tug R23 Pot Puller

Installing a Discovery Bay Power Hauler Crab/Shrimp Pot Puller

Read more »


More Posts >