The back deck isnt quite finished, but it is close. Check out the transformation:
Footings poured

Because the septic tank is close to the house, we had to frame around the openings so we could cut out some access covers

Here is the lower portion with the decking in process

Decking all finished on the lower portion

The upper portion is all framed in

The decking going down on the upper portion

We have to finish the decking on the upper portion, and then tackle the steps and railings, but at least it is semi-functional at this point.
@briandunningtonWe had a big windstorm blow a tree down but made the best of it
Upgrading our solar setup for energy independence
A few small upgrades for the boat and an end-of-summer trip to the San Juan islands
Replacing the shore power plug with a SmartPlug and adding a galvanic isolator
Installing a Discovery Bay Power Hauler Crab/Shrimp Pot Puller