The back deck isnt quite finished, but it is close. Check out the transformation:

Footings poured

Because the septic tank is close to the house, we had to frame around the openings so we could cut out some access covers

Here is the lower portion with the decking in process

Decking all finished on the lower portion

The upper portion is all framed in

The decking going down on the upper portion

We have to finish the decking on the upper portion, and then tackle the steps and railings, but at least it is semi-functional at this point.


 

@briandunnington


2022.05.24

Ranger Tug R23 Pot Puller

Installing a Discovery Bay Power Hauler Crab/Shrimp Pot Puller

Read more »


2022.05.15

Ranger Tug R23 Cave Shelf

Building a custom storage shelf for the 1/4 berth cave

Read more »


2022.01.22

Kelcema Lake Snowshoe

A fun showshoe trip to a deserted alpine lake

Read more »


2021.11.15

Ranger Tug R23 Bow Roller + Anchor Upgrade

Upgrading the bow roller, anchor, and rode

Read more »


2021.09.22

Ranger Tug R23 Battery Monitor Install

Installing a Victron BMV-712 battery monitor

Read more »


More Posts >